Solar · Coleambally Solar Pty Ltd · Solar PV - Single axis tracking
Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.
12 Jun 2026 16:45 → 13 Jun 2026 16:45 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.8367 |
| 2025-07-01 | 0.8730 |
| Capex total (greenfield) |
$264.55M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,760,148
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$2.39M
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX / MW-yr |
$15,873
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 06 Jun 2026
Notes
Project commenced construction in January 2018 and entered full-scale commercial operation in November 2018. Plant-specific capital cost was reported as more than A$200 million; this was used as the best available project-level greenfield cost. Operating life is commonly described by the owner as 25 years of affordable clean power, while Neoen said expected service life is well beyond 30 years; asset_life_years set to 30 as a conservative planning assumption.