Clermont Solar Farm (CLERMSF1)

Solar · Clermont Asset Co Pty Ltd as Trustee for Clerrmont Solar Unit Trust · Solar PV - Single axis tracking

Operational AEMO: In Service QLD1 Solar - Solar NEM data · 24 hours
93 MW
Registered nameplate capacity
24 hours revenue
$16.0k
Capacity factor
16.7%
Revenue / MWh
$42.95
Est. SRMC
$0.34/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.

Key information
Capacity
93 MW

AEMO status In Service
Project status Operational (AI)

Power Technology 2021; project entered commercial operation in June 2019.

Region QLD1
Coordinates -22.82400, 148.47100 (AI)

Clermont Solar Farm website; site located near Clermont, Queensland, 106 km north of Emerald.

MLF 0.9410
DUID CLERMSF1
Owner Clermont Asset Co Pty Ltd as Trustee for Clerrmont Solar Unit Trust
Commissioned Mar 2019
Expected closure 2049
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM Risen Energy
Module / inverter supplier PV modules; NEXTracker single-axis trackers
Inverter OEM SMA Solar Technology
Inverter model Sunny Tripower / unspecified utility-scale inverter model
Equipment confidence high
Stats window
12 Jun 2026 00:00 → 12 Jun 2026 23:59 AEST

Dispatch & revenue

12 Jun 2026 00:00 → 12 Jun 2026 23:59 AEST

Energy revenue (× MLF)
$16.0k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
371.6 MWh
Available
371.6 MWh
Curtailed
MWh
Curtailment
0.0%
of available
MLF used
0.9410
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9370
2025-07-01 0.9410

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
93 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.34/MWh
Capex total (greenfield)
$506.76M

Shown in table
$506.76M (2026 real AUD)

Reported / source value
$375.00M (2017 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
CEFC states the financing package across the two projects totaled $375 million in estimated project value; Clermont-specific site-only capex was not disclosed.

Reference
CEFC reaches 1GW solar milestone with finance across 20 large-scale solar projects (medium confidence)
Source recorded 06 Jun 2026

Capex refurbishment
Capex / MW derived
$5,478,451

Shown in table
$5.48M (2026 real AUD)

Reported / source value
$4.05M (2017 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Per-MW capex is a rough allocation from a combined financing figure and the user-supplied 92.5 MW capacity; this is not a plant-specific reported construction cost.

Reference
CEFC reaches 1GW solar milestone with finance across 20 large-scale solar projects (low confidence)
Source recorded 06 Jun 2026

Fixed OPEX (annual)
$2.50M

Shown in table
$2.50M (2026 real AUD)

Reported / source value
$1.85M (2017 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$27,027

Shown in table
$27.0k (2026 real AUD)

Reported / source value
$20.0k (2017 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific fixed O&M source found; used provided fallback default.

Variable OPEX / MWh
$0.34

Shown in table
$0.34 (2026 real AUD)

Reported / source value
$0.25 (2017 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific variable O&M source found; used provided fallback default.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 06 Jun 2026

Notes
Plant-specific reported project finance package for Wemen Solar Farm and Clermont Solar Farm combined was $375 million across 199 MWp; this is not the site-only capital cost, but is the best available project-specific reported figure found. Clermont itself was described as 90 MW by CEFC and 89 MWp DC by Gentari, and entered operation in 2019. Fixed OPEX uses the user-provided default as a fallback; no plant-specific O&M or refurbishment cost was found. The owner shown in current materials is Gentari, while the user-provided owner/legal entity was not independently verified.