Solar · Clermont Asset Co Pty Ltd as Trustee for Clerrmont Solar Unit Trust · Solar PV - Single axis tracking
Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
07 Jun 2026 02:50 → 14 Jun 2026 02:50 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9370 |
| 2025-07-01 | 0.9410 |
| Capex total (greenfield) |
$506.76M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$5,478,451
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$2.50M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$27,027
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.34
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 06 Jun 2026
Notes
Plant-specific reported project finance package for Wemen Solar Farm and Clermont Solar Farm combined was $375 million across 199 MWp; this is not the site-only capital cost, but is the best available project-specific reported figure found. Clermont itself was described as 90 MW by CEFC and 89 MWp DC by Gentari, and entered operation in 2019. Fixed OPEX uses the user-provided default as a fallback; no plant-specific O&M or refurbishment cost was found. The owner shown in current materials is Gentari, while the user-provided owner/legal entity was not independently verified.