BESS · South Australian Water Corporation · Storage - Battery
Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.
13 Jun 2026 00:00 → 13 Jun 2026 16:15 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-09-06 | 1.0025 |
| 2025-07-01 | 1.0037 |
| Capex total (greenfield) |
$1.59M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$369,198
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$25,000
Shown in table |
| Variable OPEX / MWh default |
$1.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026
Notes
No plant-specific public source for the Christies Beach Wastewater Treatment Plant battery construction cost, O&M, or performance parameters was found in the searched official SA Water sources. SA Water does state it has installed solar panels and battery storage on some existing land and facilities as part of its Zero-Cost Energy Future program, but the searched results did not identify this DUID's battery project cost or a battery-specific asset breakdown for Christies Beach. The site is part of SA Water's broader wastewater operations; the plant itself began operating in 1970 and was significantly upgraded in 2013. Because no verified plant-specific capex was found, no capex estimate was substituted.