Wind · Pacific Hydro Challicum Hills Pty Ltd · Wind Turbine - Onshore
Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.
12 Jun 2026 22:25 → 13 Jun 2026 22:25 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9718 |
| 2025-07-01 | 0.9825 |
| Capex total (greenfield) |
$143.94M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,741,703
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$55,000
Shown in table How this was derived |
| Variable OPEX / MWh |
$0.53
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 06 Jun 2026
Notes
Pacific Blue states Challicum Hills was completed in August 2003 and that construction commenced in October 2002. The reported A$76 million project cost is treated as greenfield original construction cost. No plant-specific fixed O&M figure was found, so the internal fallback was not used to populate fixed OPEX here because the instructions prefer search-backed values only.