Hydro · CI QLD PHES PTY LTD · Storage - Pumped hydro
12 Jun 2026 17:15 → 13 Jun 2026 17:15 AEST
| Capex total (greenfield) |
$3,027.43M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$252,286
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$35.60M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$47,468
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$1.27
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 06 Jun 2026
Notes
Project-specific reported investment of $2.87 billion was found for the 750 MW Capricornia PHES and transmission project. This appears to cover the project including transmission, not just the PHES asset alone. No separate refurbishment cost identified.