Coal · Joint Venture; Callide Energy Pty Ltd and IG Power (Callide) Ltd. · Turbine - Steam Super Critical
Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
07 Jun 2026 01:45 → 14 Jun 2026 01:45 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9160 |
| 2025-07-01 | 0.9222 |
| Capex total (greenfield) |
$771.52M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,836,952
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$44.77M
Shown in table Reported / source value How this was derived |
| Fixed OPEX / MW-yr |
$106,589
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$7.75
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
$8.72
Shown in table Reported / source value How this was derived |
| Heat rate GJ/MWh |
10.80
Shown in table How this was derived |
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 04 Jun 2026
Notes
Callide C was commissioned in 2001 and has a capacity of 844 MW (two units: C3 424 MW and C4 420 MW). A reported project cost of A$800 million was found in secondary project-reference material; no owner press release with the original capex figure was located in the search results. Unit C4 was rebuilt and returned to service in August 2024; that rebuild is not included in capex_total_aud.