Burdekin Solar Farm - KCI

Solar · BURDEKIN SOLAR FARM PTY LTD ATF BURDEKIN GENESIS PROJECT TRUST · Solar PV - Single axis tracking

Development AEMO: Publicly Announced Solar - Solar NEM data · 24 hours
4 MW
Researched capacity
Est. SRMC
$0.26/MWh
Key information
Capacity (AI)
4 MW

AEMO spreadsheet / NEM registration data for Burdekin Solar Farm - KCI (3.60 MW shown; no separate storage capacity identified from available sources).

AEMO status Publicly Announced
Project status Development (AI)

AEMO spreadsheet lists the asset as Publicly Announced, and no primary-source evidence of construction or commissioning was found.

Coordinates

DUID
Owner BURDEKIN SOLAR FARM PTY LTD ATF BURDEKIN GENESIS PROJECT TRUST
Commissioned Feb 2026
Expected closure 2062
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
13 Jun 2026 08:15 → 14 Jun 2026 08:15 AEST

Dispatch & revenue

13 Jun 2026 08:15 → 14 Jun 2026 08:15 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
4 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.26/MWh
Capex total (greenfield)
$4.94M

Shown in table
$4.94M (2026 real AUD)

Reported / source value
$4.68M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No verified plant-specific greenfield construction or investment cost was found for Burdekin Solar Farm - KCI.

Capex refurbishment
Capex / MW derived
$1,371,308

Shown in table
$1.37M (2026 real AUD)

Reported / source value
$1.30M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$75.9k

Shown in table
$75.9k (2026 real AUD)

Reported / source value
$72.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$21,097

Shown in table
$21.1k (2026 real AUD)

Reported / source value
$20.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Used the provided internal fallback default because no plant-specific O&M source was identified.

Variable OPEX / MWh
$0.26

Shown in table
$0.26 (2026 real AUD)

Reported / source value
$0.25 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Used the provided internal fallback default because no plant-specific variable O&M source was identified.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026

Notes
No plant-specific greenfield CAPEX announcement was found in the searched sources. Fallback operating assumptions use the provided internal defaults for solar PV single-axis tracking. The listed owner entity exists in ABN Lookup, but no source-backed project investment figure for this 3.6 MW unit could be verified.

Sources