Bungala Two Solar Farm (BNGSF2)

Solar · Bungala Two Operations Pty Ltd as trustee for the Bungala Two Operations Trust · Solar PV - Single axis tracking

Operational AEMO: In Service SA1 Solar - Solar NEM data · 7 days
135 MW
Registered nameplate capacity
7 days revenue
$111.8k
Capacity factor
12.6%
Revenue / MWh
$39.02
Est. SRMC
$0.33/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.

Key information
Capacity
135 MW

AEMO status In Service
Project status Operational (AI)

GlobalData via Power-Technology (2024): project commissioned in May 2018 and currently active; Enel Green Power site also lists Bungala 1 and 2 as operating.

Region SA1
Coordinates -32.42200, 137.84000 (AI)

Wikipedia/Wikidata: Bungala Solar Power Farm coordinates 32°25′S 137°50′E (≈ -32.422, 137.84).

MLF 0.9725
DUID BNGSF2
Owner Bungala Two Operations Pty Ltd as trustee for the Bungala Two Operations Trust
Commissioned Sep 2021
Expected closure 2044
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM JinkoSolar
Module / inverter supplier SMA Solar Technology
Inverter OEM SMA Solar Technology
Inverter model Sunny Central
Equipment confidence high
Stats window
06 Jun 2026 15:40 → 13 Jun 2026 15:40 AEST

Dispatch & revenue

06 Jun 2026 15:40 → 13 Jun 2026 15:40 AEST

Energy revenue (× MLF)
$111.8k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
2,864.7 MWh
Available
2,963.0 MWh
Curtailed
115.4 MWh
Curtailment
3.9%
of available
MLF used
0.9725
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9565
2025-07-01 0.9725

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
135 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.33/MWh
Capex total (greenfield)
$486.11M

Shown in table
$486.11M (2026 real AUD)

Reported / source value
$367.50M (2018 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Reported total project investment for the combined Bungala Solar PV Project; converted from USD to AUD for the financial profile.

Reference
Enel starts production at Australia’s largest Solar PV Project (high confidence)
Source recorded 05 Jun 2026

Capex refurbishment
Capex / MW derived
$3,600,823

Shown in table
$3.60M (2026 real AUD)

Reported / source value
$2.72M (2018 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Pro-rata capex per MW derived from the reported combined project cost and total project capacity.

Reference
Enel starts production at Australia’s largest Solar PV Project (medium confidence)
Source recorded 05 Jun 2026

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

Variable OPEX / MWh
$0.33

Shown in table
$0.33 (2026 real AUD)

Reported / source value
$0.25 (2018 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific variable O&M was found in the searched sources; server-side default retained.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 05 Jun 2026

Notes
Plant-specific reported capex for the full 275 MW Bungala Solar PV Project was US$315 million in Enel's 30 May 2018 announcement. Using an approximate 2018 AUD/USD exchange rate of 0.8595 implies ~AUD 367.5 million nominal. This figure appears to cover the combined Bungala Solar One and Bungala Solar Two project, so the amount is not strictly attributable to Bungala Two's 135 MW DUID share; capex_per_mw_aud is therefore a simple pro-rata estimate. Solar PV design life set to 25-30 years; 30 years used as a planning default.