Wind · Bulgana Wind Farm Pty Ltd · Wind Turbine - Onshore
Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.
14 May 2026 19:05 → 13 Jun 2026 19:05 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.8733 |
| 2025-07-01 | 0.8907 |
| Capex total (greenfield) |
$702.74M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$3,438,045
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$55,000
Shown in table |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 05 Jun 2026
Notes
Plant-specific greenfield project cost was found in official Victorian Government and Neoen sources. The hub is a hybrid project (204 MW wind farm + 20 MW / 34 MWh battery), but the reported total investment appears to cover the full hub, not wind-only. Fixed O&M not found in source-backed project-specific material; not estimated here because no clear plant-specific O&M benchmark was retrieved in the searched sources.