Bulgana Green Power Hub - BESS (BULBES1)

BESS · Bulgana Wind Farm Pty Ltd · Storage - Battery

In Service VIC1 Other - Other NEM data · 24 hours
20/34 MW
Registered nameplate capacity / storage
24 hours revenue
$844
Capacity factor
-0.3%
Revenue / MWh
Est. SRMC
$1.50/MWh
MLF
0.8907

Stats window 29 May 2026 04:00 → 30 May 2026 04:00 AEST

Key information
Capacity
20 MW / 34 MWh
Status In Service
Lifecycle Operating
Region VIC1
DUID BULBES1
Owner Bulgana Wind Farm Pty Ltd
Commissioned 1 Nov 2021
Expected closure 2025-07-02
Closure date
Technology Storage - Battery
Fuel Other - Other

Dispatch & revenue

29 May 2026 04:00 → 30 May 2026 04:00 AEST

Revenue (× MLF)
$844
Dispatched
-1.4 MWh
Available
460.1 MWh
Curtailed
461.5 MWh
Curtailment
100.3%
of available
MLF used
0.8907
end of period

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.

Revenue (× MLF)

Estimated $ per interval using regional RRP and MLF effective on each day.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF. Chart uses MLF effective on each interval’s date; summary total uses MLF as at the end of the selected period (same as the revenue list).
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-09-13 0.8733
2025-07-01 0.8907

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
20 MW / 34 MWh
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.50/MWh
Capex total (greenfield)
Capex refurbishment
Capex / MW default
$400,000
Capex / MWh storage default
$350,000
Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$25,000
Variable OPEX / MWh default
$1.50
Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: needs review · Capex basis: unknown