Other Generators · EDL LFG Vic Pty Ltd · Reciprocating Engine - Spark ignition
13 Jun 2026 02:20 → 14 Jun 2026 02:20 AEST
| Capex total (greenfield) |
$5.97M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,109,705
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$40,000
Shown in table |
| Variable OPEX / MWh default |
$2.00
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026
Notes
Plant-specific greenfield capex, O&M, and thermal performance data were not found in official or authoritative sources during search. EDL confirms Brooklyn is a landfill-gas site with 2.8 MW installed capacity and a start of operation listed as not clearly disclosed on the public site; the only source-backed operating assumption used here is zero direct emissions intensity for landfill-gas-to-electricity at the generator level, but this should still be reviewed for lifecycle accounting use cases.