Broadsound_BESS

BESS · Broadsound Solar Farm Pty Ltd · Storage - Battery

Development AEMO: Anticipated Other - Other NEM data · 24 hours
240/360 MW
Researched capacity / storage
Est. SRMC
$1.75/MWh
Key information
Capacity (AI)
240 MW / 360 MWh

AEMO generator register / spreadsheet entry for Broadsound_BESS (anticipated): 240 MW / 360 MWh.

AEMO status Anticipated
Project status Development (AI)

No public evidence located of site construction/commissioning; project is still listed as anticipated with first commissioning date in 2027.

Coordinates

DUID
Owner Broadsound Solar Farm Pty Ltd
Commissioned Jan 2027
Expected closure 2056
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM Tesla
Battery platform / chemistry Megapack
Inverter OEM
Inverter / PCS model
Equipment confidence low
Stats window
12 Jun 2026 21:40 → 13 Jun 2026 21:40 AEST

Dispatch & revenue

12 Jun 2026 21:40 → 13 Jun 2026 21:40 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
240 MW / 360 MWh
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.75/MWh
Capex total (greenfield)
$527.43M

Shown in table
$527.43M (2026 real AUD)

Reported / source value
$500.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Provides context that Iberdrola referenced Broadsound within its Australian investment program, though it does not specifically state BESS-only cost.

Reference
Iberdrola starts up the world's first wind-solar hybrid plant in Australia (medium confidence)
Source recorded 04 Jun 2026

Capex refurbishment
Capex / MWh storage derived
$1,465,073

Shown in table
$1.47M (2026 real AUD)

Reported / source value
$1.39M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$7.01M

Shown in table
$7.01M (2026 real AUD)

Reported / source value
$6.00M (2022 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$29,206

Shown in table
$29.2k (2026 real AUD)

Reported / source value
$25.0k (2022 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No project-specific battery fixed O&M was found in the searched sources.

Variable OPEX / MWh
$1.75

Shown in table
$1.75 (2026 real AUD)

Reported / source value
$1.50 (2022 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No project-specific battery variable O&M was found in the searched sources.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 04 Jun 2026

Notes
No plant-specific battery-only capex announcement was found. The reported A$500m investment appears to cover the full Broadsound Solar Farm and Battery project (solar + BESS), not the battery alone. I therefore allocate the full reported project cost to this generator as a proxy, but this likely overstates BESS-only capex. Registered battery output is 240MW with 360MWh storage; project documents also describe the BESS as 180MW/360MWh. Use with caution.

Sources