Broadsound Solar Farm (BRDDSF01)

Solar · Broadsound Solar Farm Pty Ltd · Solar PV - Single axis tracking

Development AEMO: Committed QLD1 Solar - Solar NEM data · 24 hours
368 MW
Registered nameplate capacity
24 hours revenue
$84.3k
Capacity factor
17.2%
Revenue / MWh
$55.38
Est. SRMC
$0.27/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.

Key information
Capacity
368 MW

AEMO status Committed
Project status Development (AI)

Region QLD1
Coordinates

MLF 0.9247
DUID BRDDSF01
Owner Broadsound Solar Farm Pty Ltd
Commissioned Jan 2027
Expected closure 2056
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
22 Jul 2026 00:00 → 22 Jul 2026 23:59 AEST

Dispatch & revenue

22 Jul 2026 00:00 → 22 Jul 2026 23:59 AEST

Energy revenue (× MLF)
$84.3k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
1,522.3 MWh
Available
4,364.6 MWh
Curtailed
2,842.4 MWh
Curtailment
65.1%
of available
MLF used
0.9247
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • State of chargeINITIAL_ENERGY_STORAGE (MWh at interval start) from UNIT_SOLUTION, published for bidirectional/storage units. Next-day data — the SOC line lags real time by up to a day.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2025-12-24 0.9290
2026-07-01 0.9247

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
368 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.27/MWh
Capex total (greenfield)
$565.50M

Shown in table
$565.50M (2026 real AUD)

Reported / source value
$518.00M (2023 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Official AIP summary for Broadsound Solar Farm Pty Ltd states project capital expenditure of $518 million.

Reference
Australian Industry Participation Plan Summary - Project Phase (high confidence)
Source recorded 05 Jun 2026

Capex refurbishment
Capex / MW derived
$1,536,691

Shown in table
$1.54M (2026 real AUD)

Reported / source value
$1.41M (2023 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Per-MW capex was calculated from the reported total project cost and the installed DC capacity stated in the same official summary.

Reference
Australian Industry Participation Plan Summary - Project Phase (high confidence)
Source recorded 05 Jun 2026

Fixed OPEX (annual)
$8.03M

Shown in table
$8.03M (2026 real AUD)

Reported / source value
$7.52M (2023 nominal)
Table total may differ if recalculated from $/MW × registered capacity after CPI adjustment.

Fixed OPEX / MW-yr
$21,834

Shown in table
$21.8k (2026 real AUD)

Reported / source value
$20.0k (2023 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific fixed O&M figure was found; internal default was used as instructed.

Variable OPEX / MWh
$0.27

Shown in table
$0.27 (2026 real AUD)

Reported / source value
$0.25 (2023 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 05 Jun 2026

Notes
Project-specific greenfield capex was found in the Australian Industry Participation plan summary for Broadsound Solar Farm Pty Ltd: capital expenditure $518 million for Broadsound Solar Farm. The AEMO/Aurecon 2024 review supports single-axis tracking as the applicable utility-scale PV configuration and notes higher maintenance than fixed-tilt. Fixed O&M and asset life were taken from the AEMO/Aurecon 2024 technology review as fallback assumptions; fixed O&M is set at the internal default per MW-year because a project-specific O&M figure was not found. Capacity used for per-MW capex calculation is 376 MWdc from the project summary; this is slightly different from the user-supplied 368 MW, so capex_per_mw_aud should be treated as approximate.

Sources