Solar · Broadsound Solar Farm Pty Ltd · Solar PV - Single axis tracking
Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
23 Jun 2026 14:10 → 23 Jul 2026 14:10 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.INITIAL_ENERGY_STORAGE (MWh at interval start) from UNIT_SOLUTION, published for bidirectional/storage units. Next-day data — the SOC line lags real time by up to a day.| Effective from | MLF |
|---|---|
| 2025-12-24 | 0.9290 |
| 2026-07-01 | 0.9247 |
| Capex total (greenfield) |
$565.50M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,536,691
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$8.03M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$21,834
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.27
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 05 Jun 2026
Notes
Project-specific greenfield capex was found in the Australian Industry Participation plan summary for Broadsound Solar Farm Pty Ltd: capital expenditure $518 million for Broadsound Solar Farm. The AEMO/Aurecon 2024 review supports single-axis tracking as the applicable utility-scale PV configuration and notes higher maintenance than fixed-tilt. Fixed O&M and asset life were taken from the AEMO/Aurecon 2024 technology review as fallback assumptions; fixed O&M is set at the internal default per MW-year because a project-specific O&M figure was not found. Capacity used for per-MW capex calculation is 376 MWdc from the project summary; this is slightly different from the user-supplied 368 MW, so capex_per_mw_aud should be treated as approximate.