Brinkworth BESS

BESS · Brinkworth Solar Farm Pty Ltd · Storage - Battery

Publicly Announced Other - Other NEM data · 24 hours
250/1,000 MW
Registered nameplate capacity / storage
Est. SRMC
$1.50/MWh
Key information
Capacity
250 MW / 1,000 MWh
Status Publicly Announced
Lifecycle Pre-operating
DUID
Owner Brinkworth Solar Farm Pty Ltd
Commissioned
Expected closure
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM
Battery platform / chemistry
Inverter OEM
Inverter / PCS model
Stats window
03 Jun 2026 17:00 → 04 Jun 2026 17:00 AEST

Dispatch & revenue

03 Jun 2026 17:00 → 04 Jun 2026 17:00 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
250 MW / 1,000 MWh
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.50/MWh
Capex total (greenfield)
$105.48M

Shown in table
$105.48M (2026 real AUD)

Reported / source value
$99.99M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MW
$421,941

Shown in table
$421.9k (2026 real AUD)

Reported / source value
$400.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex / MWh storage default
$350,000

Shown in table
$350.0k (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$25,000

Shown in table
$25.0k (2026 real AUD)

Variable OPEX / MWh default
$1.50

Shown in table
$1.50 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026

Notes
Plant-specific greenfield CAPEX for Brinkworth BESS was not found in the sources searched. Available owner/developer sources confirm the project is proposed at 250MW/1000MWh and located adjacent to Brinkworth Substation; South Australian government release confirms Brinkworth BESS was awarded under the state's FERM tender, but no project cost was disclosed. Because no project-specific investment figure was found, CAPEX has not been estimated here. O&M, asset life, and other operating assumptions were not sourced specifically for this asset and remain unfilled.

Sources