BESS · Brinkworth Solar Farm Pty Ltd · Storage - Battery
03 Jun 2026 17:00 → 04 Jun 2026 17:00 AEST
| Capex total (greenfield) |
$105.48M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$421,941
Shown in table Reported / source value |
| Capex / MWh storage default |
$350,000
Shown in table |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$25,000
Shown in table |
| Variable OPEX / MWh default |
$1.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026
Notes
Plant-specific greenfield CAPEX for Brinkworth BESS was not found in the sources searched. Available owner/developer sources confirm the project is proposed at 250MW/1000MWh and located adjacent to Brinkworth Substation; South Australian government release confirms Brinkworth BESS was awarded under the state's FERM tender, but no project cost was disclosed. Because no project-specific investment figure was found, CAPEX has not been estimated here. O&M, asset life, and other operating assumptions were not sourced specifically for this asset and remain unfilled.