BESS · Brendale Battery ProjectCo Pty Lt · Storage - Battery
Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
21 Jul 2026 19:45 → 22 Jul 2026 19:45 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
Stored energy at the start of each 5‑minute interval (AEMO INITIAL_ENERGY_STORAGE).
Available up to the latest next‑day dispatch file.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.INITIAL_ENERGY_STORAGE (MWh at interval start) from UNIT_SOLUTION, published for bidirectional/storage units. Next-day data — the SOC line lags real time by up to a day.| Effective from | MLF |
|---|---|
| 2025-09-02 | 1.0014 |
| 2026-07-01 | 1.0027 |
| Capex total (greenfield) |
$210.97M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$514,562
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$3.46M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$16,878
Shown in table Reported / source value |
| Variable OPEX / MWh |
$1.58
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 05 Jun 2026
Notes
Plant-specific greenfield capex was found in Akaysha Energy's project announcement as '$200M Brendale BESS'. No separate owner-disclosed full-project total beyond this figure was located. The project is a 205 MW / 410 MWh battery; the provided 204.96 MW capacity was used for per-MW calculations.