Braemar 2 Power Station (BRAEMAR5)

Coal · NewGen Braemar 2 Partnership comprising Arrow Braemar 2 Pty Ltd and Arrow Southern Generation Pty Ltd · Turbine - OCGT

Operational AEMO: In Service QLD1 Fossil - Coal Seam Methane NEM data · 30 days
173 MW
Registered nameplate capacity
30 days revenue
$691.4k
Capacity factor
5.3%
Revenue / MWh
$104.83
Est. SRMC
$3.14/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.

Key information
Capacity
173 MW

AEMO status In Service
Project status Operational (AI)

Power Technology (2024) says the project was commissioned in August 2009 and is currently active; Arrow Energy page describes it as owned and operated gas-fired station.

Region QLD1
Coordinates -27.10987, 150.90765 (AI)

Climate Change in Australia/AEMO generators_uniq.csv lists BRAEMAR5 (Braemar 2 Power Station) at -27.1098727, 150.9076533.

MLF 0.9667
DUID BRAEMAR5
Owner NewGen Braemar 2 Partnership comprising Arrow Braemar 2 Pty Ltd and Arrow Southern Generation Pty Ltd
Commissioned
Expected closure 2049
Closure date
Technology Turbine - OCGT
Fuel Fossil - Coal Seam Methane
Equipment OEM Siemens
Equipment type / model SGT5-2000E / SGen5-100A
Equipment confidence high
Stats window
15 May 2026 04:40 → 14 Jun 2026 04:40 AEST

Dispatch & revenue

15 May 2026 04:40 → 14 Jun 2026 04:40 AEST

Energy revenue (× MLF)
$691.4k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
6,595.7 MWh
Available
103,486.1 MWh
Curtailed
96,890.4 MWh
Curtailment
93.6%
of available
MLF used
0.9667
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9627
2025-07-01 0.9667

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Other
Capacity
173 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$3.14/MWh
Capex total (greenfield)
$833.33M

Shown in table
$833.33M (2026 real AUD)

Reported / source value
$530.00M (2009 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Reported greenfield project construction cost for Braemar 2.

Reference
Arrow Energy Quarterly Report - Quarter ended 30 June 2009 (high confidence)
Source recorded 05 Jun 2026

Capex refurbishment
Capex / MW derived
$4,816,956

Shown in table
$4.82M (2026 real AUD)

Reported / source value
$3.06M (2009 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Calculated from reported total cost and provided unit capacity.

Reference
Arrow Energy Quarterly Report - Quarter ended 30 June 2009 (medium confidence)
Source recorded 05 Jun 2026

Fixed OPEX (annual)
$10.88M

Shown in table
$10.88M (2026 real AUD)

Reported / source value
$6.92M (2009 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Calculated from fallback fixed O&M and provided capacity.

Fixed OPEX / MW-yr
$62,893

Shown in table
$62.9k (2026 real AUD)

Reported / source value
$40.0k (2009 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific fixed O&M source found in web search; internal fallback default used per instructions.

Variable OPEX / MWh
$3.14

Shown in table
$3.14 (2026 real AUD)

Reported / source value
$2.00 (2009 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific variable O&M source found in web search; internal fallback default used per instructions.

Fuel cost / GJ
Heat rate GJ/MWh
7.94

Shown in table
$7.94 (2026 real AUD)

How this was derived
Used AEMO benchmark OCGT heat rate as closest source-backed thermal assumption; no plant-specific heat rate located.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 05 Jun 2026

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 05 Jun 2026

Notes
Greenfield construction cost reported by Arrow Energy as approximately A$530 million, completed $15 million below budget. Station achieved operational status in July 2009. No plant-specific refurbishment cost identified. Capacity in source material is 450 MW for the whole station; capex_per_mw_aud is calculated on the provided 173 MW unit capacity per user instructions, but this likely understates/does not represent the full station because the reported cost applies to the whole 450 MW project.

Sources