Coal · NewGen Braemar 2 Partnership comprising Arrow Braemar 2 Pty Ltd and Arrow Southern Generation Pty Ltd · Turbine - OCGT
Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
13 Jun 2026 08:45 → 14 Jun 2026 08:45 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9627 |
| 2025-07-01 | 0.9667 |
| Capex total (greenfield) |
$833.33M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$4,816,956
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$10.88M
Shown in table Reported / source value How this was derived |
| Fixed OPEX / MW-yr |
$62,893
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$3.14
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
7.94
Shown in table How this was derived Reference |
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 05 Jun 2026
Notes
Greenfield construction cost reported by Arrow Energy as approximately A$530 million, completed $15 million below budget. Station achieved operational status in July 2009. No plant-specific refurbishment cost identified. Capacity in source material is 450 MW for the whole station; capex_per_mw_aud is calculated on the provided 173 MW unit capacity per user instructions, but this likely understates/does not represent the full station because the reported cost applies to the whole 450 MW project.