Bracewell Energy Park

Solar · TE H2 Australia · Solar PV - Single axis tracking

Development AEMO: Publicly Announced Solar - Solar NEM data · 24 hours
500 MW
Researched capacity
Est. SRMC
$0.26/MWh
Key information
Capacity (AI)
500 MW

AEMO spreadsheet value provided in prompt; no independent capacity source was returned by web search.

AEMO status Publicly Announced
Project status Development (AI)

AEMO spreadsheet lists Bracewell Energy Park as Publicly Announced, and the project is described as a future solar PV development with commissioning stated for 2031-07-01 in the prompt.

Coordinates

DUID
Owner TE H2 Australia
Commissioned Jul 2031
Expected closure
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Equipment confidence low
Stats window
12 Jun 2026 19:35 → 13 Jun 2026 19:35 AEST

Dispatch & revenue

12 Jun 2026 19:35 → 13 Jun 2026 19:35 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
500 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.26/MWh
Capex total (greenfield)
$685.80M

Shown in table
$685.80M (2026 real AUD)

Reported / source value
$650.14M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MW derived
$1,371,308

Shown in table
$1.37M (2026 real AUD)

Reported / source value
$1.30M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$10.55M

Shown in table
$10.55M (2026 real AUD)

Reported / source value
$10.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$21,097

Shown in table
$21.1k (2026 real AUD)

Reported / source value
$20.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific O&M source was found; retained server-side fallback as instructed.

Variable OPEX / MWh
$0.26

Shown in table
$0.26 (2026 real AUD)

Reported / source value
$0.25 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific variable O&M source was found; retained server-side fallback as instructed.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026

Notes
No plant-specific greenfield capex announcement for Bracewell Energy Park (solar PV single-axis tracking) was found in the searched owner/developer and official sources. The TE H2 site materials identified Bracewell/East End as a 500MW project near Bracewell, but the accessible materials found were for a battery storage proposal and did not provide a solar-park construction cost. O&M and asset-life values therefore use server defaults/industry heuristics for utility-scale solar PV with single-axis tracking; single-axis tracking is noted by AEMO as higher-cost than fixed tilt. The fixed OPEX annual figure is the default rate multiplied by 500.11 MW.