Borumba

Hydro · Queensland Hydro · Storage - Pumped hydro

Development AEMO: Anticipated Hydro - Water NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$1.20/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Anticipated
Project status Development (AI)

Coordinates

DUID
Owner Queensland Hydro
Commissioned Jul 2035
Expected closure 2134
Closure date
Technology Storage - Pumped hydro
Fuel Hydro - Water
Turbine OEM
Turbine type / model
Stats window
13 Jun 2026 09:05 → 14 Jun 2026 09:05 AEST

Dispatch & revenue

13 Jun 2026 09:05 → 14 Jun 2026 09:05 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Pumped hydro
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.20/MWh
Capex total (greenfield)
$18,852.46M

Shown in table
$18,852.46M (2026 real AUD)

Reported / source value
$18,400.00M (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Queensland Hydro project material reports the Borumba reference project cost was reforecast to $18.4 billion.

Reference
Borumba Pumped Hydro Project Stakeholder Reference Group Presentation (high confidence)
Source recorded 06 Jun 2026

Capex refurbishment
Capex / MWh storage

How this was derived
Calculated from the reported total project cost and the 48,000 MWh reference storage capacity.

Reference
Borumba Pumped Hydro Project Stakeholder Reference Group Presentation (high confidence)
Source recorded 06 Jun 2026

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$45,000

Shown in table
$45.0k (2026 real AUD)

Variable OPEX / MWh default
$1.20

Shown in table
$1.20 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 06 Jun 2026

Notes
Use 2,000 MW and 48,000 MWh reference project capacity from Queensland Hydro documentation. The reported project cost was revised from $14.2 billion to $18.4 billion in December 2024 / February 2025 project materials. Capex per MW and per MWh are calculated from the reported total cost and reference capacity. No reliable plant-specific fixed or variable O&M figures were found in the searched official sources, so those fields remain null rather than falling back to generic benchmarks.

Sources