Solar · Spark Infrastructure Holdings No. 6 Pty Limited · Solar PV - Single axis tracking
Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.
12 Jun 2026 00:00 → 12 Jun 2026 23:59 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.8719 |
| 2025-07-01 | 0.9187 |
| Capex total (greenfield) |
$244.79M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,023,072
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
How this was derived |
| Fixed OPEX / MW-yr default |
$20,000
Shown in table |
| Variable OPEX / MWh default |
$0.25
Shown in table How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 05 Jun 2026
Notes
Spark Infrastructure reported Bomen Solar Farm at ~$188m total cost at completion in an April 2019 investor presentation; the site was operating by mid-2020 and Spark later said construction completed under budget at ~$180m in an August 2020 investor presentation. I used the earlier reported total project cost as the greenfield capex figure because it is the clearest plant-specific investment announcement; the later figure is a revised at-completion value. Operating cost specifics were not located in source-backed project disclosures, so O&M values were left null rather than inferred from generic benchmarks.