Bomen Solar Farm (BOMENSF1)

Solar · Spark Infrastructure Holdings No. 6 Pty Limited · Solar PV - Single axis tracking

Operational AEMO: In Service NSW1 Solar - Solar NEM data · 7 days
121 MW
Registered nameplate capacity
7 days revenue
$117.0k
Capacity factor
10.1%
Revenue / MWh
$56.73
Est. SRMC
$0.25/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
121 MW

AEMO status In Service
Project status Operational (AI)

Spark Renewables project page (2020): Bomen Solar Farm has been operating since 2020.

Region NSW1
Coordinates

Flow Power / Spark Renewables project pages place the site ~10 km north-east of Wagga Wagga, NSW; precise coordinates not found in provided sources.

MLF 0.9187
DUID BOMENSF1
Owner Spark Infrastructure Holdings No. 6 Pty Limited
Commissioned Nov 2020
Expected closure 2050
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM Jinko Solar
Module / inverter supplier PV module supplier
Inverter OEM SMA Solar Technology
Inverter model string inverter model not documented
Equipment confidence high
Stats window
07 Jun 2026 09:00 → 14 Jun 2026 09:00 AEST

Dispatch & revenue

07 Jun 2026 09:00 → 14 Jun 2026 09:00 AEST

Energy revenue (× MLF)
$117.0k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
2,061.9 MWh
Available
2,064.8 MWh
Curtailed
3.9 MWh
Curtailment
0.2%
of available
MLF used
0.9187
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.8719
2025-07-01 0.9187

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
121 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.25/MWh
Capex total (greenfield)
$244.79M

Shown in table
$244.79M (2026 real AUD)

Reported / source value
$188.00M (2019 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Later Spark presentation gives a revised completion cost of about A$180m after construction finished.

Reference
30 June 2020 / HY2020 Investor Presentation (high confidence)
Source recorded 05 Jun 2026

Capex refurbishment
Capex / MW derived
$2,023,072

Shown in table
$2.02M (2026 real AUD)

Reported / source value
$1.55M (2019 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)

How this was derived
No reliable plant-specific O&M disclosure located in source-backed results.

Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

Variable OPEX / MWh default
$0.25

Shown in table
$0.25 (2026 real AUD)

How this was derived
No reliable plant-specific variable O&M disclosure located in source-backed results.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 05 Jun 2026

Notes
Spark Infrastructure reported Bomen Solar Farm at ~$188m total cost at completion in an April 2019 investor presentation; the site was operating by mid-2020 and Spark later said construction completed under budget at ~$180m in an August 2020 investor presentation. I used the earlier reported total project cost as the greenfield capex figure because it is the clearest plant-specific investment announcement; the later figure is a revised at-completion value. Operating cost specifics were not located in source-backed project disclosures, so O&M values were left null rather than inferred from generic benchmarks.

Sources