Bolivar Waste Water Treatment (BOWWBA1)

BESS · South Australian Water Corporation · Storage - Battery

Operational AEMO: In Service SA1 Other - Other NEM data · 24 hours
3/5 MW
Registered nameplate capacity / storage
24 hours revenue
$65
Capacity factor
-0.5%
Revenue / MWh
Est. SRMC
$1.58/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.

Key information
Capacity
3 MW / 5 MWh

AEMO status In Service
Project status Operational (AI)

Global Energy Monitor 2025 lists the Bolivar Waste Water Treatment solar project as operating; AEMO registration shows In Service and the battery commissioning date was 2023-02-01.

Region SA1
Coordinates -34.73100, 138.58500 (AI)

SA Planning Commission 2021 application documents place the SA Water Bolivar site approximately 18 km north of Adelaide CBD, adjacent the Princes Highway; site is at Bolivar WWTP, Hodgson Rd, Bolivar.

MLF 0.9999
DUID BOWWBA1
Owner South Australian Water Corporation
Commissioned Feb 2023
Expected closure 2045
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM Unknown
Battery platform / chemistry Battery energy storage system
Inverter OEM Unknown
Inverter / PCS model Unknown
Equipment confidence low
Stats window
13 Jun 2026 00:20 → 14 Jun 2026 00:20 AEST

Dispatch & revenue

13 Jun 2026 00:20 → 14 Jun 2026 00:20 AEST

Energy revenue (× MLF)
$65
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
-0.4 MWh
Available
7.5 MWh
Curtailed
8.7 MWh
Curtailment
116.3%
of available
MLF used
0.9999
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-09-06 1.0004
2025-07-01 0.9999

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
3 MW / 5 MWh
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.58/MWh
Capex total (greenfield)
$1.30M

Shown in table
$1.30M (2026 real AUD)

Reported / source value
$1.23M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MWh storage derived
$257,853

Shown in table
$257.9k (2026 real AUD)

Reported / source value
$244.4k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$81.2k

Shown in table
$81.2k (2026 real AUD)

Reported / source value
$77.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$26,371

Shown in table
$26.4k (2026 real AUD)

Reported / source value
$25.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Variable OPEX / MWh
$1.58

Shown in table
$1.58 (2026 real AUD)

Reported / source value
$1.50 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: unknown · AI checked 05 Jun 2026

Notes
No plant-specific greenfield capital cost for the Bolivar battery (BOWWBA1) was found in official owner/government sources or reliable project announcements. The available SA Water and government materials located in search relate to Bolivar wastewater treatment upgrades, SA Water's broader renewable energy program, and an on-site battery storage mention at Bolivar, but not a project-specific capex figure for this battery unit. Internal technology defaults were therefore retained for non-capex operating assumptions only.