Gas Peakers · Iberdrola Australia Energy Markets Pty Limited · Turbine - OCGT
Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.
15 May 2026 01:35 → 14 Jun 2026 01:35 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9996 |
| 2025-07-01 | 1.0000 |
| Capex total (greenfield) |
$162.53M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,265,823
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$6.09M
Shown in table Reported / source value How this was derived |
| Fixed OPEX / MW-yr |
$47,468
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$2.64
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
$12.66
Shown in table Reported / source value How this was derived |
| Heat rate GJ/MWh |
11.75
Shown in table How this was derived Reference |
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026
Notes
Bolivar Power Station is a relocated 120-128 MW dual-fuel peaking asset. The owner states it leases the aero-derivative gas turbine equipment from the South Australian Government for 25 years, and project documents say construction at Bolivar commenced in February 2022 with commissioning on fuel oil in December 2022 and gas in May 2023. No plant-specific greenfield purchase/construction capex announcement was found in the searched official sources, so no reported capex value is entered. Fixed O&M was not found as a plant-specific disclosed value, so a server-side default was applied. Heat rate was set to the AEMO generic new entrant OCGT static heat rate (as-generated, HHV).