Wind · Bodangora Wind Farm Pty Ltd · Wind Turbine - Onshore
Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.
14 Jun 2026 00:00 → 14 Jun 2026 07:10 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9518 |
| 2025-07-01 | 0.9638 |
| Capex total (greenfield) |
$318.92M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,817,554
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$8.41M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$74,324
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.68
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 05 Jun 2026
Notes
Greenfield project cost reported at approximately A$236 million. No refurbishment cost identified. Fixed O&M and variable O&M used as fallback defaults because no plant-specific O&M source was found in the search results.