Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.
12 Jun 2026 00:00 → 12 Jun 2026 23:59 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-08-20 | 0.9866 |
| 2025-07-01 | 1.0072 |
| Capex total (greenfield) |
$152.84M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$382,096
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$7.98M
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX / MW-yr |
$39,924
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$4.86
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026
Notes
No plant-specific greenfield capex figure was found in owner/developer/government sources during search. The project is confirmed as a 200 MW / 400 MWh battery in construction and later commissioned in April 2025. O&M values use AEMO/Aurecon 2024 battery benchmark assumptions for a 200 MW / 400 MWh BESS. The 2024 AEMO/Aurecon review also explicitly references Blyth (SA) as a 200 MW / 400 MWh project in construction.