Blyth BESS (BLYTHB1)

BESS · Blyth Battery P/L as trustee for Blyth Battery Trust · Storage - Battery

Operational AEMO: In Service SA1 Other - Other NEM data · 7 days
200/400 MW
Registered nameplate capacity / storage
7 days revenue
$46.9k
Capacity factor
-3.6%
Revenue / MWh
Est. SRMC
$4.86/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.

Key information
Capacity
200 MW / 400 MWh

AEMO status In Service
Project status Operational (AI)

pv magazine Australia, 2025-04-10: Blyth BESS was commissioned and is live.

Region SA1
Coordinates -33.93200, 138.18600 (AI)

ESCOSA generation licence application: located approximately 7 km west of Blyth township; project materials place the site west of Blyth, SA.

MLF 1.0072
DUID BLYTHB1
Owner Blyth Battery P/L as trustee for Blyth Battery Trust
Commissioned Apr 2025
Expected closure 2044
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM CATL
Battery platform / chemistry LFP battery packs / cells
Inverter OEM Power Electronics
Inverter / PCS model BESS inverter / PCS (grid-forming)
Equipment confidence high
Stats window
06 Jun 2026 23:05 → 13 Jun 2026 23:05 AEST

Dispatch & revenue

06 Jun 2026 23:05 → 13 Jun 2026 23:05 AEST

Energy revenue (× MLF)
$46.9k
FCAS revenue (× MLF)
$10.3k
FCAS volume
16,020.6 MWh
Dispatched
-1,226.1 MWh
Available
29,649.7 MWh
Curtailed
30,934.8 MWh
Curtailment
104.3%
of available
MLF used
1.0072
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-08-20 0.9866
2025-07-01 1.0072

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
200 MW / 400 MWh
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$4.86/MWh
Capex total (greenfield)
$152.84M

Shown in table
$152.84M (2026 real AUD)

Reported / source value
$140.00M (2023 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Owner/developer announcement confirms construction start but does not state total project cost.

Reference
Neoen launches construction of 200 MW / 400 MWh Blyth Battery in South Australia (medium confidence)
Source recorded 05 Jun 2026

Capex refurbishment
Capex / MWh storage derived
$382,096

Shown in table
$382.1k (2026 real AUD)

Reported / source value
$350.0k (2023 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$7.98M

Shown in table
$7.98M (2026 real AUD)

Reported / source value
$7.30M (2023 nominal)
Table total may differ if recalculated from $/MW × registered capacity after CPI adjustment.

How this was derived
Calculated annual fixed O&M using the benchmark rate and site capacity.

Reference
2024 Energy Technology Cost and Parameters Review (high confidence)
Source recorded 05 Jun 2026

Fixed OPEX / MW-yr
$39,924

Shown in table
$39.9k (2026 real AUD)

Reported / source value
$36.6k (2023 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Benchmark fixed O&M assumption for BESS.

Reference
2024 Energy Technology Cost and Parameters Review (high confidence)
Source recorded 05 Jun 2026

Variable OPEX / MWh
$4.86

Shown in table
$4.86 (2026 real AUD)

Reported / source value
$4.45 (2023 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Benchmark variable O&M assumption for BESS.

Reference
2024 Energy Technology Cost and Parameters Review (high confidence)
Source recorded 05 Jun 2026

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026

Notes
No plant-specific greenfield capex figure was found in owner/developer/government sources during search. The project is confirmed as a 200 MW / 400 MWh battery in construction and later commissioned in April 2025. O&M values use AEMO/Aurecon 2024 battery benchmark assumptions for a 200 MW / 400 MWh BESS. The 2024 AEMO/Aurecon review also explicitly references Blyth (SA) as a 200 MW / 400 MWh project in construction.

Sources