Solar · X-Elio Australia Pty Ltd · Solar PV - Single axis tracking
Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
14 May 2026 19:35 → 13 Jun 2026 19:35 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9433 |
| 2025-07-01 | 0.9543 |
| Capex total (greenfield) |
$251.17M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,697,083
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$3.46M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$23,364
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.29
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 05 Jun 2026
Notes
Plant-specific reported greenfield investment of $215 million was found for the 200 MW Blue Grass Solar Farm. This is the project-level construction/investment figure reported by X-ELIO/CEFC; the site’s registered DUID output appears to relate to a 148 MW unit share, so capex_per_mw_aud is calculated on the 200 MW project capacity reported in sources, not the DUID capacity. No separate refurbishment cost identified. The project was officially opened in November 2022.