Blackwater Hybrid System

Solar · Blackwater Project Nominees Pty Ltd as trustee for the Blackwater Project Trust · Solar PV - Single axis tracking

Development AEMO: Publicly Announced Solar - Solar NEM data · 30 days
170 MW
Researched capacity
Est. SRMC
$0.25/MWh
Key information
Capacity (AI)
170 MW

AEMO spreadsheet entry for Blackwater Hybrid System lists 170.00 MW; no separate public project announcement found in the provided search results.

AEMO status Publicly Announced
Project status Development (AI)

AEMO registration label is Publicly Announced; with no evidence of site construction or commissioning found, the project is best treated as in development.

Coordinates

DUID
Owner Blackwater Project Nominees Pty Ltd as trustee for the Blackwater Project Trust
Commissioned Jun 2029
Expected closure
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
14 May 2026 22:00 → 13 Jun 2026 22:00 AEST

Dispatch & revenue

14 May 2026 22:00 → 13 Jun 2026 22:00 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
170 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.25/MWh
Capex total (greenfield)
$233.12M

Shown in table
$233.12M (2026 real AUD)

Reported / source value
$221.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No verified plant-specific construction or investment cost was found in the searched sources.

Capex refurbishment
Capex / MW derived
$1,371,308

Shown in table
$1.37M (2026 real AUD)

Reported / source value
$1.30M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

How this was derived
No verified plant-specific or benchmark O&M source was retrieved for this generator in the available search results.

Variable OPEX / MWh default
$0.25

Shown in table
$0.25 (2026 real AUD)

How this was derived
No verified plant-specific or benchmark variable O&M source was retrieved for this generator in the available search results.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026

Notes
No plant-specific greenfield capex announcement or owner/developer investment figure was found in web search results. The only directly relevant source located was a NEM generator listing confirming the site, owner, technology, capacity (170 MW), and online date (2029-06-01), but it did not provide capex or O&M data. Internal defaults were not applied because project-specific capex could not be verified from official or high-quality sources.