Blackwater Hybrid System

Solar · Blackwater Project Nominees Pty Ltd as trustee for the Blackwater Project Trust · Solar PV - Single axis tracking

Development AEMO: Publicly Announced Solar - Solar NEM data · 24 hours
170 MW
Researched capacity
Est. SRMC
$0.25/MWh
Key information
Capacity (AI)
170 MW

AEMO spreadsheet entry for Blackwater Hybrid System lists 170.00 MW; no separate public project announcement found in the provided search results.

AEMO status Publicly Announced
Project status Development (AI)

AEMO registration label is Publicly Announced; with no evidence of site construction or commissioning found, the project is best treated as in development.

Coordinates —

DUID —
Owner Blackwater Project Nominees Pty Ltd as trustee for the Blackwater Project Trust
Commissioned Jun 2029
Expected closure —
Closure date —
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM —
Module / inverter supplier —
Inverter OEM —
Inverter model —
Stats window
24 Sep 2026 06:15 → 25 Sep 2026 06:15 AEST

Dispatch & revenue

24 Sep 2026 06:15 → 25 Sep 2026 06:15 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
170 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.25/MWh
Capex total (greenfield)
$233.12M

Shown in table
$233.12M (2026 real AUD)

Reported / source value
$221.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No verified plant-specific construction or investment cost was found in the searched sources.

Capex refurbishment
—
Capex / MW derived
$1,371,308

Shown in table
$1.37M (2026 real AUD)

Reported / source value
$1.30M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
—
Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

How this was derived
No verified plant-specific or benchmark O&M source was retrieved for this generator in the available search results.

Variable OPEX / MWh default
$0.25

Shown in table
$0.25 (2026 real AUD)

How this was derived
No verified plant-specific or benchmark variable O&M source was retrieved for this generator in the available search results.

Fuel cost / GJ
—
Heat rate GJ/MWh
—

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026

Notes
No plant-specific greenfield capex announcement or owner/developer investment figure was found in web search results. The only directly relevant source located was a NEM generator listing confirming the site, owner, technology, capacity (170 MW), and online date (2029-06-01), but it did not provide capex or O&M data. Internal defaults were not applied because project-specific capex could not be verified from official or high-quality sources.