15 May 2026 07:35 → 14 Jun 2026 07:35 AEST
| Capex total (greenfield) default |
$800.00M
Shown in table |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage default |
$200,000
Shown in table |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$45,000
Shown in table |
| Variable OPEX / MWh default |
$1.20
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: unknown · Status: ai estimated · Capex basis: unknown · AI checked 04 Jun 2026
Notes
No web search results were returned for this specific generator, so generator-specific financial and operating assumptions could not be source-backed. As a pumped hydro / water storage asset, fuel cost is assumed nil and direct operational emissions are treated as zero for the purposes of this record, but these are not sourced for the project itself. A DUID, region, online date, capex, O&M, efficiency, asset life, and refurbishment/closure details were not found in the provided search results.