Big-T Project

BESS · BE Power · Storage - Pumped hydro

Publicly Announced Hydro - Water NEM data · 24 hours
400/4,000 MW
Registered nameplate capacity / storage
Est. SRMC
$1.20/MWh

Stats window 29 May 2026 04:00 → 30 May 2026 04:00 AEST

Key information
Capacity
400 MW / 4,000 MWh
Status Publicly Announced
Lifecycle Pre-operating
DUID
Owner BE Power
Commissioned
Expected closure
Closure date
Technology Storage - Pumped hydro
Fuel Hydro - Water

Dispatch & revenue

29 May 2026 04:00 → 30 May 2026 04:00 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Pumped hydro
Capacity
400 MW / 4,000 MWh
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.20/MWh
Capex total (greenfield)
Capex refurbishment
Capex / MW default
$3,500,000
Capex / MWh storage default
$200,000
Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$45,000
Variable OPEX / MWh default
$1.20
Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: ai estimated · Capex basis: unknown · AI checked 04 Jun 2026

Notes
No web search results were returned for this specific generator, so generator-specific financial and operating assumptions could not be source-backed. As a pumped hydro / water storage asset, fuel cost is assumed nil and direct operational emissions are treated as zero for the purposes of this record, but these are not sourced for the project itself. A DUID, region, online date, capex, O&M, efficiency, asset life, and refurbishment/closure details were not found in the provided search results.

Sources

  • search_result (low)