Berrybank Wind Farm (BRYB2WF2)

Wind · Berrbank Development Pty ltd · Wind Turbine - Onshore

Operational AEMO: In Service VIC1 Wind - Wind NEM data · 24 hours
109 MW
Registered nameplate capacity
24 hours revenue
$-330
Capacity factor
51.4%
Revenue / MWh
$-0.24
Est. SRMC
$0.65/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.

Key information
Capacity
109 MW

AEMO status In Service
Project status Operational (AI)

GPG Berrybank Wind Farm page (2022): commercial operations commenced 1 July 2021; Berrybank 2 also noted operational in 2022.

Region VIC1
Coordinates -37.94880, 143.53020 (AI)

The Wind Power listing for Berrybank 1 gives WGS84 coordinates -37°56'56.7" 143°31'48.8"; project location also described by GPG as Berrybank, 80 km west of Geelong, 14 km east of Lismore.

MLF 0.9465
DUID BRYB2WF2
Owner Berrbank Development Pty ltd
Commissioned Aug 2022
Expected closure 2052
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM Vestas
Turbine model V136-4.2MW
Equipment confidence high
Stats window
12 Jun 2026 16:45 → 13 Jun 2026 16:45 AEST

Dispatch & revenue

12 Jun 2026 16:45 → 13 Jun 2026 16:45 AEST

Energy revenue (× MLF)
$-330
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
1,347.2 MWh
Available
1,166.5 MWh
Curtailed
57.3 MWh
Curtailment
4.9%
of available
MLF used
0.9465
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9315
2025-07-01 0.9465

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
109 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.65/MWh
Capex total (greenfield)
$369.79M

Shown in table
$369.79M (2026 real AUD)

Reported / source value
$284.00M (2019 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Corporate press release corroborates the project funding amount for Berrybank wind farm.

Reference
GPG (Naturgy Group) and Vision sign a funding agreement for the construction of a 180 MW wind farm in Australia (high confidence)
Source recorded 05 Jun 2026

Capex refurbishment
Capex / MW derived
$3,386,371

Shown in table
$3.39M (2026 real AUD)

Reported / source value
$2.60M (2019 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Calculated per-MW capex using reported total investment and registered capacity.

Reference
Berrybank Wind Farm Victoria | GPG Naturgy | Wind Farm Australia (medium confidence)
Source recorded 05 Jun 2026

Fixed OPEX (annual)
$7.82M

Shown in table
$7.82M (2026 real AUD)

Reported / source value
$6.01M (2019 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$71,615

Shown in table
$71.6k (2026 real AUD)

Reported / source value
$55.0k (2019 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
User-provided internal fallback used because no plant-specific O&M source was found.

Variable OPEX / MWh
$0.65

Shown in table
$0.65 (2026 real AUD)

Reported / source value
$0.50 (2019 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
User-provided internal fallback used because no plant-specific variable O&M source was found.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 05 Jun 2026

Notes
Plant-specific greenfield investment figure found from project owner/developer materials for Berrybank Wind Farm Phase 1 / Berrybank 1. The reported $284 million appears to relate to the 180 MW Phase 1 project, not specifically the 109.2 MW DUID capacity, so capex_per_mw is calculated by allocating the reported project total across the registered capacity on a simple per-MW basis. No refurbishment capex found. O&M and performance fields use technology default fallback due to no plant-specific verified source found.

Sources