Berrybank Wind Farm (BRYB1WF1)

Wind · Berrbank Development Pty ltd · Wind Turbine - Onshore

Operational AEMO: In Service VIC1 Wind - Wind NEM data · 24 hours
181 MW
Registered nameplate capacity
24 hours revenue
$-7.1k
Capacity factor
54.3%
Revenue / MWh
$-3.02
Est. SRMC
$0.50/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.

Key information
Capacity
181 MW

AEMO status In Service
Project status Operational (AI)

GPG Berrybank project page: commercial operations commenced 1 July 2021.

Region VIC1
Coordinates -37.94908, 143.53022 (AI)

The Wind Power listing for Berrybank 1 gives WGS84 coordinates -37°56'56.7" 143°31'48.8".

MLF 0.9465
DUID BRYB1WF1
Owner Berrbank Development Pty ltd
Commissioned Apr 2021
Expected closure 2050
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM Vestas
Turbine model V136-4.2MW
Equipment confidence high
Stats window
12 Jun 2026 16:45 → 13 Jun 2026 16:45 AEST

Dispatch & revenue

12 Jun 2026 16:45 → 13 Jun 2026 16:45 AEST

Energy revenue (× MLF)
$-7.1k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
2,351.7 MWh
Available
1,981.4 MWh
Curtailed
32.0 MWh
Curtailment
1.6%
of available
MLF used
0.9465
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9315
2025-07-01 0.9465

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
181 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.50/MWh
Capex total (greenfield) default
$397.32M

Shown in table
$397.32M (2026 real AUD)

Capex refurbishment
Capex / MW default
$2,200,000

Shown in table
$2.20M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$55,000

Shown in table
$55.0k (2026 real AUD)

Variable OPEX / MWh default
$0.50

Shown in table
$0.50 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: ai estimated · Capex basis: unknown · AI checked 04 Jun 2026

Notes
No web search results were returned for this specific generator, so no generator-specific financial values could be source-backed. Wind turbines have no fuel cost and no heat rate in the conventional thermal sense; emissions intensity is operationally zero at point of generation. Asset life is a technology-default estimate for onshore wind only, not a sourced Berrybank-specific value.

Sources

  • asset_life_years (low)
  • emissions_intensity_tco2_mwh (low)