Coal · AGL Macquarie Pty Limited · Turbine - Steam Sub Critical
Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.
12 Jun 2026 13:15 → 13 Jun 2026 13:15 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9664 |
| 2025-07-01 | 0.9637 |
| Capex total (greenfield) |
$3,190.61M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
How this was derived Reference |
| Capex / MW derived |
$4,834,254
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$25.5k
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$39
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$11.05
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ default |
$4.50
Shown in table |
| Heat rate GJ/MWh |
9.45
Shown in table How this was derived Reference |
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026
Notes
Capex remains unverified for original construction cost; no authoritative plant-specific greenfield capex located in the search set. The site is an existing subcritical black coal station commissioned in 1985-86. The $63 million, $70 million, and >$200 million figures identified are refurbishment/upgrade expenditures, not original build capex. Heat-rate input is taken from AEMO heat-rate data for Bayswater; the implied efficiency is calculated as 3.6 / 9.45 = 35.9% (HHV basis).