Gas Peakers · Ergon Energy Queensland Pty Ltd · Turbine - OCGT
Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
06 Jun 2026 22:00 → 13 Jun 2026 22:00 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9331 |
| 2025-07-01 | 0.9392 |
| Capex total (greenfield) |
$46.84M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
$81.88M
Shown in table Reported / source value The saved AI note for this row describes refurbishment or upgrade capex, not greenfield construction. See Capex refurbishment or run Refresh from AI for an updated source. Reference |
| Capex / MW derived |
$1,265,823
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$3.31M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$89,546
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$4.94
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
$12.66
Shown in table Reported / source value How this was derived |
| Heat rate GJ/MWh |
10.81
Shown in table How this was derived Reference |
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026
Notes
No plant-specific greenfield construction cost was found in official owner/government sources. The only specific dollar figure found was a 2023 Queensland Government-funded $75 million hydrogen expansion/replacement project, which is a refurbishment/transition project rather than original construction capex. OCGT O&M and heat-rate values were taken from AEMO/Aurecon 2024 technical parameters for large GT / OCGT-type plants and the server-side fuel cost fallback was used.