Barcaldine Power Station (BARCALDN)

Gas Peakers · Ergon Energy Queensland Pty Ltd · Turbine - OCGT

Operational AEMO: In Service QLD1 Fossil - Natural Gas Pipeline NEM data · 30 days
37 MW
Registered nameplate capacity
30 days revenue
$0
Capacity factor
0.0%
Revenue / MWh
Est. SRMC
$141.78/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.

Key information
Capacity
37 MW

AEMO status In Service
Project status Operational (AI)

Ergon Energy profile and Barcaldine Power Station page describe it as an owned/operated gas-fired power station that supplies the grid; Wikipedia notes it has been operational since 1995/1999.

Region QLD1
Coordinates -23.55250, 145.31417 (AI)

Wikipedia coordinates for Barcaldine Power Station: -23.55250, 145.31417.

MLF 0.9392
DUID BARCALDN
Owner Ergon Energy Queensland Pty Ltd
Commissioned
Expected closure 2034
Closure date
Technology Turbine - OCGT
Fuel Fossil - Natural Gas Pipeline
Gas turbine OEM GE
Turbine / engine model LM6000
Equipment confidence low
Stats window
15 May 2026 07:25 → 14 Jun 2026 07:25 AEST

Dispatch & revenue

15 May 2026 07:25 → 14 Jun 2026 07:25 AEST

Energy revenue (× MLF)
$0
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
MWh
Available
MWh
Curtailed
MWh
Curtailment
of available
MLF used
0.9392
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9331
2025-07-01 0.9392

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
OCGT
Capacity
37 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$141.78/MWh
Capex total (greenfield)
$46.84M

Shown in table
$46.84M (2026 real AUD)

Reported / source value
$44.40M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
$81.88M

Shown in table
$81.88M (2026 real AUD)

Reported / source value
$75.00M (2023 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

The saved AI note for this row describes refurbishment or upgrade capex, not greenfield construction. See Capex refurbishment or run Refresh from AI for an updated source.

Reference
Barcaldine Power Station to add hydrogen generation in $75-million expansion (medium confidence)
Source recorded 05 Jun 2026

Capex / MW derived
$1,265,823

Shown in table
$1.27M (2026 real AUD)

Reported / source value
$1.20M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$3.31M

Shown in table
$3.31M (2026 real AUD)

Reported / source value
$3.14M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$89,546

Shown in table
$89.5k (2026 real AUD)

Reported / source value
$84.9k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Provides the large-plant OCGT-related fixed O&M benchmark used as a proxy.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 05 Jun 2026

Variable OPEX / MWh
$4.94

Shown in table
$4.94 (2026 real AUD)

Reported / source value
$4.68 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Provides the benchmark variable O&M value used as proxy.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 05 Jun 2026

Fuel cost / GJ
$12.66

Shown in table
$12.66 (2026 real AUD)

Reported / source value
$12.00 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific gas supply cost was found in the searches, so the provided fallback was retained.

Heat rate GJ/MWh
10.81

Shown in table
$10.81 (2026 real AUD)

How this was derived
Used as proxy heat rate for an OCGT generator.

Reference
Draft 2025 GenCost submission material (table citing Aurecon 2024 gas turbine heat rates) (high confidence)
Source recorded 05 Jun 2026

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026

Notes
No plant-specific greenfield construction cost was found in official owner/government sources. The only specific dollar figure found was a 2023 Queensland Government-funded $75 million hydrogen expansion/replacement project, which is a refurbishment/transition project rather than original construction capex. OCGT O&M and heat-rate values were taken from AEMO/Aurecon 2024 technical parameters for large GT / OCGT-type plants and the server-side fuel cost fallback was used.

Sources