UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.8584 |
| 2025-07-01 | 0.8986 |
| Capex total (greenfield) |
$179.73M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,797,297
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$20,000
Shown in table How this was derived Reference |
| Variable OPEX / MWh |
$0.34
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 05 Jun 2026
Notes
Plant-specific EPC contract value of A$133m was found and used as the best available reported greenfield construction cost proxy for original build capex. This appears to be the EPC contract value, not necessarily the full total project investment; however, no clearer owner/developer total project cost announcement was found in official sources. The site is a 110MWDC solar park, while the user-supplied registered capacity is 100MW; capex_per_mw_aud is calculated on 100MW as instructed. Asset life assumed from utility-scale solar default.