Bald Hills Wind Farm (BALDHWF1)

Wind · Bald Hills Wind Farm Pty Ltd · Wind Turbine - Onshore

Operational AEMO: In Service VIC1 Wind - Wind NEM data · 7 days
107 MW
Registered nameplate capacity
7 days revenue
$121.6k
Capacity factor
26.6%
Revenue / MWh
$25.56
Est. SRMC
$0.00/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.

Key information
Capacity
107 MW

AEMO status In Service
Project status Operational (AI)

Bald Hills Wind Farm website: "Fully operational as of May 2015" (baldhillswindfarm.com.au, accessed via search result excerpt).

Region VIC1
Coordinates -38.79600, 145.91700 (AI)

Wikidata/Wikipedia-derived coordinates for Bald Hills Wind Farm near Tarwin Lower, Victoria (Wikidata coordinates excerpt in search results).

MLF 0.9862
DUID BALDHWF1
Owner Bald Hills Wind Farm Pty Ltd
Commissioned
Expected closure 2040
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM Senvion
Turbine model MM92
Equipment confidence high
Stats window
07 Jun 2026 07:35 → 14 Jun 2026 07:35 AEST

Dispatch & revenue

07 Jun 2026 07:35 → 14 Jun 2026 07:35 AEST

Energy revenue (× MLF)
$121.6k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
4,755.2 MWh
Available
4,713.3 MWh
Curtailed
1.6 MWh
Curtailment
0.0%
of available
MLF used
0.9862
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9848
2025-07-01 0.9862

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
107 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
$300.00M

Shown in table
$300.00M (2026 real AUD)

How this was derived
Local reporting at construction commencement provides the selected nominal capex figure. It appears to describe the full 52-turbine project, but does not provide a detailed cost breakdown.

Reference
It’s official – work has begun on Bald Hills Wind Farm (medium confidence)
Source recorded 04 Jun 2026

Capex refurbishment
Capex / MW derived
$2,814,259

Shown in table
$2.81M (2026 real AUD)

How this was derived
Derived unit capex equals approximately AUD 2.81 million/MW using the reported project cost and official capacity.

Reference
It’s official – work has begun on Bald Hills Wind Farm (medium confidence)
Source recorded 04 Jun 2026

Fixed OPEX (annual)
$3.09M

Shown in table
$3.09M (2026 real AUD)

How this was derived
Annual fixed O&M is a derived technology-default estimate scaled to Bald Hills capacity.

Reference
2025 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 04 Jun 2026

Fixed OPEX / MW-yr
$29,000

Shown in table
$29.0k (2026 real AUD)

How this was derived
Technology benchmark used because Bald Hills site-level O&M cost accounts were not found publicly.

Reference
2025 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 04 Jun 2026

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

How this was derived
Variable O&M is set to zero as an incremental value because AEMO/GHD includes O&M in fixed opex for onshore wind.

Reference
2025 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 04 Jun 2026

Fuel cost / GJ
$0.00

Shown in table
$0.00 (2026 real AUD)

How this was derived
Wind is the energy source, so a fuel supply price per GJ is not applicable; zero is used for dispatch-cost modelling.

Reference
Wind energy (high confidence)
Source recorded 04 Jun 2026

Heat rate GJ/MWh

How this was derived
Heat rate is a thermal generator metric and is not meaningful for a wind turbine generator.

Reference
Wind energy (high confidence)
Source recorded 04 Jun 2026

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 04 Jun 2026

Notes
Bald Hills is a 52 x 2.05 MW Senvion MM92 onshore wind farm with 106.6 MW total capacity, first export on 24 February 2015 and fully operational in May 2015. Publicly available project capex is conflicting: local reporting at construction start called it a $300 million project, while an ABC-sourced 2014 report described the project as $400 million and mentioned the 27 km grid-connection powerline; Power Technology reports $219.33m but the currency and basis are not clear. The financial_profile uses the $300 million nominal reported construction-start figure and flags medium confidence. Fixed and variable O&M, asset life and retirement/refurbishment assumptions are technology defaults from AEMO/GHD 2025 rather than Bald Hills financial accounts. Operational direct emissions and fuel cost are treated as zero for wind; heat rate and thermal efficiency are not meaningful for wind generation. Major operational/legal note: in March 2022 the Victorian Supreme Court ordered Bald Hills to abate night-time noise nuisance and pay $260,000 damages; this is an operating constraint/refurbishment-risk note, not a planned closure. No current public closure or repowering date was found.