Aramara Solar Farm

Solar · Aramara Solar Pty Ltd · Solar PV - Single axis tracking

Development AEMO: Anticipated Solar - Solar NEM data · 20h
140 MW
Researched capacity
Est. SRMC
$0.00/MWh
Key information
Capacity (AI)
140 MW

Eco Energy World / RenewEconomy (2015) and Ecology and Heritage Partners (approval notice) both cite a 140 MW Aramara solar farm; later project profiles also list 140 MW.

AEMO status Anticipated
Project status Development (AI)

Eco Energy World planning consent announcement via RenewEconomy (2015) and later project summaries still describe Aramara as planned/announced, not built.

Coordinates

DUID
Owner Aramara Solar Pty Ltd
Commissioned Jun 2028
Expected closure 2054
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM
Module / inverter supplier PV module / inverter supplier
Inverter OEM
Inverter model
Equipment confidence low
Stats window
13 Jun 2026 00:00 → 13 Jun 2026 20:25 AEST

Dispatch & revenue

13 Jun 2026 00:00 → 13 Jun 2026 20:25 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar pv single axis tracking
Capacity
140 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
$150.00M

Shown in table
$150.00M (2026 real AUD)

Capex refurbishment
Capex / MW derived
$1,071,429

Shown in table
$1.07M (2026 real AUD)

Fixed OPEX (annual)
$1.22M

Shown in table
$1.22M (2026 real AUD)

Fixed OPEX / MW-yr
$12,000

Shown in table
$12.0k (2026 real AUD)

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

Fuel cost / GJ
$0.00

Shown in table
$0.00 (2026 real AUD)

Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 02 Jun 2026

Notes
Specific generator-level O&M, refurbishment and operating-cost disclosures were not found. Capex is based on a 13 Dec 2018 EEW sale announcement reported by pv magazine Australia: full capex estimated in excess of AUD 150m for a 130 MW Aramara project; this is treated as a nominal 2018 lower-bound reported estimate and not escalated. This implies AUD 1.154m/MW on the 130 MW capex scope. The user-supplied NEM capacity is 101.4 MW, while a January 2026 Powerlink planning statement lists Aramara Solar Farm as 104 MW committed and older development/planning sources describe 130 MW or 140 MW. Fixed O&M, variable O&M, asset life and discount rate use GenCost 2024-25 large-scale solar PV single-axis-tracking defaults; fixed annual opex is calculated as 101.4 MW x 1,000 kW/MW x AUD 12/kW-year = AUD 1,216,800/year. No site-specific closure or major refurbishment announcement was found; using a 30-year economic/design life implies indicative retirement or major rebuild around 2056 if the stated 2026-12-01 online date occurs.

Sources