Appin (APPIN)

Coal · EDL CSM NSW Pty Ltd · Reciprocating Engine - Spark ignition

Operational AEMO: In Service NSW1 Fossil - Waste Coal Mine Gas NEM data · 30 days
56 MW
Registered nameplate capacity
Est. SRMC
$8.51/MWh
Key information
Capacity
56 MW

AEMO status In Service
Project status Operational (AI)

Region NSW1
Coordinates

DUID APPIN
Owner EDL CSM NSW Pty Ltd
Commissioned
Expected closure 2036
Closure date
Technology Reciprocating Engine - Spark ignition
Fuel Fossil - Waste Coal Mine Gas
Plant supplier
Boiler / turbine equipment
Stats window
16 May 2026 02:45 → 15 Jun 2026 02:45 AEST

Dispatch & revenue

16 May 2026 02:45 → 15 Jun 2026 02:45 AEST

No dispatch data for DUID APPIN in this period.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Waste coal mine gas reciprocating engine - spark ignition
Capacity
56 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$8.51/MWh
Capex total (greenfield)
$59.17M

Shown in table
$59.17M (2026 real AUD)

Capex refurbishment
Capex / MW derived
$1,063,830

Shown in table
$1.06M (2026 real AUD)

Fixed OPEX (annual)
$1.63M

Shown in table
$1.63M (2026 real AUD)

Fixed OPEX / MW-yr
$29,383

Shown in table
$29.4k (2026 real AUD)

Variable OPEX / MWh
$8.51

Shown in table
$8.51 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh
10.29

Shown in table
$10.29 (2026 real AUD)

Confidence: medium · Status: ai estimated · Capex basis: estimated · AI checked 02 Jun 2026

Notes
Appin-specific public financial data is limited. The reported capex found is for the combined Appin and Tower project: $100 million, 94 MW, 94 Caterpillar G3516 generator sets, project began May 1995. The capex value here allocates that reported nominal project cost to the APPIN DUID using 55.62 MW / 94 MW; therefore capex_basis is estimated, not reported. O&M values are not generator-specific and use the AEMO/Aurecon 2024 reciprocating-engine default assumptions. Heat rate/efficiency is estimated from Caterpillar G3516-class gas generator ratings rather than Appin test data. Emissions intensity uses a third-party presentation of Clean Energy Regulator NGER facility data for Appin CSM Power Station; older public sources show different intensities, so this should be reviewed against the CER table before investment-grade use. Major refurbishment/maintenance evidence exists: EDL had a purpose-built Appin engine rebuild facility opened in 2002 and reported overhauls, and Caterpillar/World Coal reported high engine operating hours without major overhaul. Contract/closure: no explicit AEMO closure notice was found in web-search snippets; Appin/Tower recontracted for a further 18 years in 2015/2016, with contract end date shown as 2034, while the current mine owner/operator has changed since South32’s 2024 sale of Illawarra Metallurgical Coal.