BESS · South Australian Water Corporation · Storage - Battery
Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.
13 Jun 2026 00:00 → 13 Jun 2026 16:10 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-09-06 | 1.0025 |
| 2025-07-01 | 1.0037 |
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
—
|
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
—
|
| Variable OPEX / MWh |
—
|
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: estimated · AI checked 02 Jun 2026
Notes
Exact financial data for the Adelaide Desalination Plant is limited. Estimates based on typical battery storage projects have been used where specific data is unavailable.