BESS · Western Downs BESS Pty Ltd as trustee for Western Downs BESS Trust · Storage - Battery
Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
15 May 2026 19:55 → 14 Jun 2026 19:55 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-11-14 | 0.9762 |
| 2025-07-01 | 0.9891 |
| 2025-09-08 | 0.9899 |
| Capex total (greenfield) |
$188.29M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$369,198
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$6.72M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$26,371
Shown in table Reported / source value |
| Variable OPEX / MWh |
$1.58
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026
Notes
No plant-specific greenfield CAPEX figure was found in the searched owner/developer or government sources. The project was identified as Stage 1 and Stage 2 of Neoen's Western Downs Battery, with both stages reported at 270 MW / 540 MWh and the combined asset at 540 MW / 1,080 MWh. Operating and cost assumptions use server fallback values for battery storage where plant-specific O&M data was not found.