Upper Tumut (UPPTUMUT)

Hydro · Snowy Hydro Ltd · Hydro - Dam

Operational AEMO: In Service NSW1 Hydro - Water NEM data · 602h
616 MW
Registered nameplate capacity
602h revenue
$4.20M
Capacity factor
11.4%
Revenue / MWh
$99.16
Est. SRMC
$1.00/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
616 MW

AEMO status In Service
Project status Operational (AI)

AEMO registration listing indicates Upper Tumut is In Service; inferred as operational because it is a long-established hydro station with no evidence of active construction or commissioning.

Region NSW1
Coordinates —

MLF 0.9670
DUID UPPTUMUT
Owner Snowy Hydro Ltd
Commissioned —
Expected closure 2070
Closure date —
Technology Hydro - Dam
Fuel Hydro - Water
Turbine OEM Snowy Hydro
Turbine type / model Hydro turbine, dam plant (specific model not publicly identified)
Equipment confidence low
Stats window
01 Sep 2026 00:00 → 26 Sep 2026 02:15 AEST

Dispatch & revenue

01 Sep 2026 00:00 → 26 Sep 2026 02:15 AEST

Energy revenue (× MLF)
$4.20M
FCAS revenue (× MLF)
$4.2k
FCAS volume
5,497.1 MWh
Dispatched
42,304.0 MWh
Available
330,755.1 MWh
Curtailed
292,133.6 MWh
Curtailment
88.3%
of available
MLF used
0.9670
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional price — dispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • State of charge — INITIAL_ENERGY_STORAGE (MWh at interval start) from UNIT_SOLUTION, published for bidirectional/storage units. Next-day data — the SOC line lags real time by up to a day.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9236
2025-07-01 0.9408
2026-07-01 0.9670

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Hydro
Capacity
616 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.00/MWh
Capex total (greenfield) default
$2,464.00M

Shown in table
$2,464.00M (2026 real AUD)

Capex refurbishment
—
Capex / MW default
$4,000,000

Shown in table
$4.00M (2026 real AUD)

Fixed OPEX (annual)
—
Fixed OPEX / MW-yr default
$40,000

Shown in table
$40.0k (2026 real AUD)

Variable OPEX / MWh default
$1.00

Shown in table
$1.00 (2026 real AUD)

Fuel cost / GJ
—
Heat rate GJ/MWh
—

Confidence: unknown · Status: needs review · Capex basis: unknown