Tungatinah (TUNGATIN)

Hydro · Hydro-Electric Corporation · Hydro - Dam

Operational AEMO: In Service TAS1 Hydro - Water NEM data · 7 days
125 MW
Registered nameplate capacity
7 days revenue
$0
Capacity factor
0.0%
Revenue / MWh
—
Est. SRMC
$1.00/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. TAS1 regional price (RRP) on right axis.

Key information
Capacity
125 MW

AEMO status In Service
Project status Operational (AI)

Hydro Tasmania / Hydro-Electric Corporation station information indicates Tungatinah is an existing hydro power station in service.

Region TAS1
Coordinates -42.23000, 146.36000 (AI)

Approximate station area near Tungatinah, Tasmania; precise coordinates not found in provided search results.

MLF 0.9334
DUID TUNGATIN
Owner Hydro-Electric Corporation
Commissioned —
Expected closure 2100
Closure date —
Technology Hydro - Dam
Fuel Hydro - Water
Turbine OEM Escher Wyss
Turbine type / model Francis turbine
Equipment confidence low
Stats window
18 Sep 2026 06:40 → 25 Sep 2026 06:40 AEST

Dispatch & revenue

18 Sep 2026 06:40 → 25 Sep 2026 06:40 AEST

Energy revenue (× MLF)
$0
FCAS revenue (× MLF)
$0
FCAS volume
— MWh
Dispatched
— MWh
Available
— MWh
Curtailed
— MWh
Curtailment
—
of available
MLF used
0.9334
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional price — dispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • State of charge — INITIAL_ENERGY_STORAGE (MWh at interval start) from UNIT_SOLUTION, published for bidirectional/storage units. Next-day data — the SOC line lags real time by up to a day.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9078
2025-07-01 0.9061
2026-07-01 0.9334

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Hydro
Capacity
125 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.00/MWh
Capex total (greenfield) default
$500.00M

Shown in table
$500.00M (2026 real AUD)

Capex refurbishment
—
Capex / MW default
$4,000,000

Shown in table
$4.00M (2026 real AUD)

Fixed OPEX (annual)
—
Fixed OPEX / MW-yr default
$40,000

Shown in table
$40.0k (2026 real AUD)

Variable OPEX / MWh default
$1.00

Shown in table
$1.00 (2026 real AUD)

Fuel cost / GJ
—
Heat rate GJ/MWh
—

Confidence: unknown · Status: needs review · Capex basis: unknown