Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.
13 Jun 2026 00:00 → 13 Jun 2026 23:59 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.8988 |
| 2025-07-01 | 0.9144 |
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
$210,970
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$45,000
Shown in table |
| Variable OPEX / MWh |
$1.05
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026
Notes
Snowy Hydro sources confirm Tumut 3 is a pumped-storage hydro station, first opened in the 1970s and upgraded in 2012, but no plant-specific original greenfield construction cost was found in the searched official sources. Because Tumut 3 predates readily available project-cost disclosures and the searches did not return a reported total investment figure, capex fields are left blank rather than estimated. Existing value in the station factsheet indicates 1,800 MW generating capacity and completion in 1973, with upgrade in 2012. The schema's requested normalised type 'hydro' maps most closely to pumped_hydro for Tumut 3.