Townsville Power Station (YABULU)

Gas Baseload · RATCH-Australia · Turbine - CCGT

Operational AEMO: In Service QLD1 Fossil - Natural Gas Pipeline NEM data · 30 days
160 MW
Registered nameplate capacity
30 days revenue
$432.6k
Capacity factor
3.6%
Revenue / MWh
$103.93
Est. SRMC
$84.30/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.

Key information
Capacity
160 MW

AEMO status In Service
Project status Operational (AI)

AEMO NEM registration lists Townsville Power Station (DUID YABULU) as In Service; treating as full commercial operation absent contrary project evidence.

Region QLD1
Coordinates -19.26400, 146.81700 (AI)

Townsville Power Station / Yabulu area location derived from public maps and plant references near Townsville, QLD.

MLF 0.9508
DUID YABULU
Owner RATCH-Australia
Commissioned
Expected closure 2046
Closure date
Technology Turbine - CCGT
Fuel Fossil - Natural Gas Pipeline
Gas turbine OEM General Electric
CCGT configuration / turbine model CCGT configuration/model not publicly documented
Steam turbine OEM
Steam turbine model
Equipment confidence low
Stats window
14 May 2026 23:45 → 13 Jun 2026 23:45 AEST

Dispatch & revenue

14 May 2026 23:45 → 13 Jun 2026 23:45 AEST

Energy revenue (× MLF)
$432.6k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
4,162.8 MWh
Available
4,152.4 MWh
Curtailed
1.7 MWh
Curtailment
0.0%
of available
MLF used
0.9508
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9549
2025-07-01 0.9508

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
CCGT
Capacity
160 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$84.30/MWh
Capex total (greenfield) default
$288.00M

Shown in table
$288.00M (2026 real AUD)

Capex refurbishment
Capex / MW default
$1,800,000

Shown in table
$1.80M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$35,000

Shown in table
$35.0k (2026 real AUD)

Variable OPEX / MWh default
$1.80

Shown in table
$1.80 (2026 real AUD)

Fuel cost / GJ default
$11.00

Shown in table
$11.00 (2026 real AUD)

Heat rate GJ/MWh default
7.50

Shown in table
$7.50 (2026 real AUD)

Confidence: unknown · Status: needs review · Capex basis: unknown