Torrens Island BESS (TIB1)

BESS · TIPSCO · Storage - Battery

Operational AEMO: In Service SA1 Other - Other NEM data · 7 days
251/250 MW
Registered nameplate capacity / storage
7 days revenue
$34.4k
Capacity factor
-2.2%
Revenue / MWh
Est. SRMC
$1.50/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.

Key information
Capacity
251 MW / 250 MWh

AEMO status In Service
Project status Operational (AI)

TIPSCO / Torrens Island BESS project materials indicate the battery system was commissioned on 2023-08-01 and is in service.

Region SA1
Coordinates -34.84100, 138.50500 (AI)

Torrens Island BESS project location at Torrens Island, South Australia, from project references and site context.

MLF 0.9993
DUID TIB1
Owner TIPSCO
Commissioned Aug 2023
Expected closure 2043
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM Tesla
Battery platform / chemistry Megapack
Inverter OEM Tesla
Inverter / PCS model Megapack inverter/PCS
Equipment confidence medium
Stats window
07 Jun 2026 00:50 → 14 Jun 2026 00:50 AEST

Dispatch & revenue

07 Jun 2026 00:50 → 14 Jun 2026 00:50 AEST

Energy revenue (× MLF)
$34.4k
FCAS revenue (× MLF)
$5.5k
FCAS volume
27,512.5 MWh
Dispatched
-924.6 MWh
Available
22,203.7 MWh
Curtailed
23,192.0 MWh
Curtailment
104.5%
of available
MLF used
0.9993
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-12 0.9996
2025-07-01 0.9993

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
251 MW / 250 MWh
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.50/MWh
Capex total (greenfield) default
$87.50M

Shown in table
$87.50M (2026 real AUD)

Capex refurbishment
Capex / MWh storage default
$350,000

Shown in table
$350.0k (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$25,000

Shown in table
$25.0k (2026 real AUD)

Variable OPEX / MWh default
$1.50

Shown in table
$1.50 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: needs review · Capex basis: unknown