Gas Baseload · AGL SA Generation Pty Limited · Turbine - Steam Sub Critical
Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.
07 Jun 2026 04:30 → 14 Jun 2026 04:30 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9998 |
| 2025-07-01 | 0.9992 |
| Capex total (greenfield) |
$467.29M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
$41.67M
Shown in table Reported / source value How this was derived Reference |
| Capex / MW derived |
$2,336,449
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$15.15M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$75,761
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$5.47
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
$12.65
Shown in table Reported / source value How this was derived Reference |
| Heat rate GJ/MWh |
8.79
Shown in table How this was derived Reference |
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026
Notes
Torrens Island B commenced operations in 1976 and the four remaining units were announced for retirement on 30 June 2026; however, no reliable plant-specific original greenfield construction cost was found in the searched owner/government sources. The $32 million figure is a 2019 overhaul/refurbishment for B3 and is recorded separately. O&M and technical parameters were inferred from AEMO/Aurecon gas turbine benchmarks for comparable gas-fired thermal plant, with fuel price proxied from AEMO east coast wholesale gas market data rather than a contract price. Emissions intensity was not set from a source because the requested normalized type is 'other' and the plant-specific benchmark searched did not provide a direct plant-specific value.